Low-disruption fiber pathways

Service 05

Micro Trenching Technology

Narrow trenching for fiber deployment through asphalt and concrete pathways with reduced disruption and rapid restoration.

CTS Pacific crew performing narrow trenching along a paved infrastructure pathway.

Guam & Pacific Region

Technical overview

Built around the complete infrastructure scope.

CTS Pacific provides narrow trenching designed to create fiber pathways through asphalt and concrete while reducing the footprint of conventional trench work.

The method supports faster pathway deployment, lower traffic disruption, and rapid restoration while connecting with the broader cable-installation and commissioning scope.

Core capabilities

Technical execution in the field.

01

Narrow trench cutting

02

Fiber pathway deployment

03

Asphalt applications

04

Concrete applications

05

Reduced traffic disruption

06

Rapid pathway restoration

07

Coordination with fiber installation

Narrow underground pathway beside an industrial facility.
Client-supplied imagery
Client-supplied Vermeer equipment with a large cutting-wheel attachment on a paved surface.

Applications

Configured for the project environment.

Scope and execution are coordinated around the facility, pathway, operating environment, and related telecommunications systems.

Commercial sitesGovernment facilitiesIndustrial pathwaysCampus environmentsExisting paved areasFiber-route extensions

Execution process

From coordination to commissioning.

Each project is scoped around its technical requirements. This framework shows the major execution stages without assuming details that have not yet been established.

  1. 01

    Pathway review

    Review the proposed route, surface conditions, access, and related fiber requirements.

  2. 02

    Narrow trenching

    Cut a controlled narrow pathway through the planned asphalt or concrete route.

  3. 03

    Pathway installation

    Place the planned fiber pathway and coordinate the cable-deployment scope.

  4. 04

    Restoration

    Close and restore the pathway after the planned infrastructure is installed.

Discuss your project

Need micro trenching capability?

Share the location, project environment, target timeline, and technical scope. CTS Pacific can help identify the appropriate next step.

Request a project quote
  1. 01Services

    Select one or multiple capabilities

  2. 02Project

    Location, environment, and timeline

  3. 03Scope

    Existing conditions and intended outcome

  4. 04Contact

    Project contact information